cleat 9,301 #1 Posted 1 hour ago 2 ton mini split heat pump installation complete in the shop. Drain pipe done, I might shorten it a bit. 2 Share this post Link to post Share on other sites
cleat 9,301 #2 Posted 1 hour ago (edited) Shop backup 5000 watt heater just to keep the shop from freezing if the heat pump fails or can't keep up. ++ I wired in a thermostat for more accurate temp control than the control built into the heater. Edited 1 hour ago by cleat 2 Share this post Link to post Share on other sites
cleat 9,301 #3 Posted 1 hour ago 2 ton heat pump house inside complete with air handler that has backup electric heat coils (hopefully they never need to be used). 2 ton heat pump house outside unit nearly complete. It just needs the line sets to be full wrapped for appearance and to be sealed where they pass into the house. 1 Share this post Link to post Share on other sites
ebinmaine 80,485 #4 Posted 37 minutes ago @cleat Temp and humidity controls. Share this post Link to post Share on other sites