lynnmor 8,266 #201 Posted Wednesday at 10:43 PM 3 hours ago, cleat said: Nope, not even close. Looks like you need to jump start your OCD, the 25 fuse is in backwards and there is a debris on the fuse block. 1 2 Share this post Link to post Share on other sites
cleat 8,114 #202 Posted Wednesday at 11:01 PM 16 minutes ago, lynnmor said: Looks like you need to jump start your OCD, the 25 fuse is in backwards and there is a debris on the fuse block. Ha Ha That will be fixed when the wire harness is officially installed. 😃 2 Share this post Link to post Share on other sites
Handy Don 15,250 #203 Posted Wednesday at 11:24 PM 23 minutes ago, cleat said: That will be fixed when the wire harness is officially installed. 😃 Mighty glad to hear that! 1 Share this post Link to post Share on other sites
cleat 8,114 #204 Posted Thursday at 02:15 PM Transmission dipstick tube ready to be installed. Transmission dipstick tube liquid Teflon applied. Transmission ready for tube to be installed. Transmission tube screwed in then tightened using a 7/8" crowfoot wrench, extension, and ratchet. Transmission dipstick and silicone grease ready to be applied. Transmission dipstick silicone grease applied to rubber seal. Transmission dipstick installed. 6 Share this post Link to post Share on other sites
cleat 8,114 #205 Posted Friday at 02:07 PM Hydraulic valve control handle assembly ready to install. Tractor ready for Hydraulic valve control handle assembly to be installed. Hydraulic valve control handle 5983 nyliner bushings installed. 4 Share this post Link to post Share on other sites
cleat 8,114 #206 Posted Friday at 03:27 PM Spirol pin partly installed into the control rod bracket after a light coat of never seize was applied. Make sure pin is installed just almost to the point of entering the center hole but not quite. Towels placed down to protect paint. Hydraulic valve control handle slid through top nyliner then control arm slid on. Control arm aligned to hole in control handle then a screw of proper diameter was installed to locate proper location. Control arm spirol pin pushed in using vice grips. Do not hammer pin in because that may damage the nyliner bushing. Lift bar and pin ready to install. Lift bar and pin installed. Control rod bracket ready to install. Control rod bracket installed. Make sure it is in correct position to hold handle down when installed. I also put a little grease on the control rod where it passes through the control arm. Control rod spring ready to install. Control rod spring installed after a light coat of never size applied to control rod threads. Spring nut tightened just enough to eliminate free play but ensure spring does not bottom out when control handle pushed fully forward. Hydraulic valve assembly fully installed. 4 Share this post Link to post Share on other sites
cleat 8,114 #207 Posted yesterday at 02:56 PM (edited) Fuse block contacts cleaned. Fuse block contacts greased with white lithium grease (that grease will be used on all wire harness connections). Rest of wire harness connectors greased. Wire harness ready to be installed. Tractor ready for wire harness to be installed. Edge trim ready to be installed to bottom of front cover. Wire harness fished under front plate and roughly in position. Fuse block bolted to bracket. Relay connector bolted to front plate. Fuse block and relay connector installed. Throttle cable clip ready to be installed. Ground wires and throttle clip bolted down also PTO switch wire connected. Wire harness routing also showing edge trim installed. Wire harness clipped to hoodstand. Wire harness fastened to battery support. Wire harness fastened to battery support also taillight wire clipped to hoodstand. Taillight wire passed by hydro and fastened to hydro control plate. Wire harness installed. Fuses and start relay installed. Note there are only two fuses because the charge fuse is now to be inline by the starter motor solenoid. Edited yesterday at 02:59 PM by cleat 5 Share this post Link to post Share on other sites
cleat 8,114 #208 Posted 2 hours ago Indicator board ready for assembly. Indicator wire harness bolted to bracket. Indicator wire harness socket greased. This is the whit grease I used. Indicator board assembled. 1 Share this post Link to post Share on other sites
cleat 8,114 #209 Posted 2 hours ago Indicator board ready to be installed. Tractor ready for indicator board to be installed. Indicator board installed. Indicator board plugged in. Wire harness will be properly orientated once all connections are made. 1 Share this post Link to post Share on other sites
cleat 8,114 #210 Posted 1 hour ago Indicator lens and bushings ready to install. Indicator bushings installed. Indicator lens and bushings installed. 1 Share this post Link to post Share on other sites
cleat 8,114 #211 Posted 56 minutes ago (edited) Indicator test switch ready to be installed. Indicator test switch inner nut installed and tightened. Indicator test switch back washer installed. Indicator test switch installed. I will plug this in once final wire harness connections are made and the throttle cable is installed. Indicator board and test switch installed. Edited 54 minutes ago by cleat Share this post Link to post Share on other sites