oliver2-44 10,781 #1 Posted May 2, 2020 (edited) I put about 40 hours on the C160 with the dozer blade, grader blade and rear box blade doing a lot of drainage shaping at the house I'm doing an addition on. The C81 got in on the work with about 10 hours of grader blade work. The fill cut from the back yard was used to level the area for this 30 by 40 slab. Some day a building will rise on this slab for future edeavers I didn't get a picture of the front, but the new garage foundation and addition on the front of the house was about 3ft high. First I got 8-12 yd truck loads of free fill from someone putting in a septic system near by. Then got another 6-12y loads from a pool being but in nearby. We got to use the pool contractors skid steer for a few hours to rough it in and slope the front yard nicely. My son and grandson took a turn on the skid steer. Im not a great skid steer finish operator, so the Wheelhorses did an excellent job smoothing it out. Edited May 2, 2020 by oliver2-44 6 5 Share this post Link to post Share on other sites
Pullstart 67,060 #2 Posted May 2, 2020 Wow Jim! One job, time for an oil change! Looks great! Share this post Link to post Share on other sites
Pollack Pete 2,273 #3 Posted May 2, 2020 Good looking pair of dirt movers.Gotta love those mid-mount grader blades.Looks like you got lots of work done. Share this post Link to post Share on other sites
Tractorhead 9,212 #5 Posted May 2, 2020 Great result at all. 👍 1 Share this post Link to post Share on other sites