Jump to content
Bull

KT17 Pushrod length w/ points opening twice / revolution

Recommended Posts

Bull

Hello Members,

I have been working on getting my KT17 series 2 running again but ran into the following issue. I went to replace the points and condenser prior to placing the engine back onto the frame and found that while the points begin to open at the S mark and fully at the T mark they also reopen further before the flywheel completes one revolution. 

I am worried about cam failure or possible pushrod degradation and was wondering if anyone knows the proper length of the pushrod and minimum length for it to work. I don't want to pull the motor apart to replace the cam and might have to go possibly electronic if the pushrod length is acceptable. Any suggestions would be appreciated .

 

Regards,

Bob

 

Share this post


Link to post
Share on other sites
 
pfrederi

there are 2 different push rods for KT 17 II  What is your spec #

Share this post


Link to post
Share on other sites
 
Bull

Hello,

My spec # is 24350 ad engine serial Number:14220438.

Share this post


Link to post
Share on other sites
 
pfrederi

That spec # is beyond what my manual shows....  The Rehlko site only has one spec number listed (not much help there anymore :()  

 

The most common push rod and used in the engines WH used is 52 411 01 which was superseded to  52 411 05

 

Either way they are both discontinued:(

Share this post


Link to post
Share on other sites
 
953 nut
6 hours ago, Bull said:

points begin to open at the S mark and fully at the T mark they also reopen further before the flywheel completes one revolution. 

Sounds like you haven't adjusted the ignition points correctly. Have you set the ignition points using this method?

  • Find the wide opening: Rotate the engine crankshaft or flywheel by hand until the lobe forces the breaker points to their widest possible opening. 
  • Loosen the screw: Slightly loosen the mounting screw that holds the points bracket so the plate can slide with gentle pressure. 
  • Set the gap: Insert a 0.020-inch feeler gauge between the point contacts. Adjust the bracket using a screwdriver in the adjustment slot until you feel a slight drag on the feeler gauge. 
  • Tighten and verify: Tighten the securing screw firmly. Recheck the gap with the feeler gauge to make sure it did not shift when tightened.

Share this post


Link to post
Share on other sites
 
Bull

Hello Everyone,

I redid my procedure and maybe being tired last night and with my eyesight not being what it once was everything turned out fine. Thanks for all your input. I did see those pushrods mentioned by Paul on EBAY if anyone ever needs them. Price points are all over the place. I am getting a little bit closer to remounting the engine on the frame. I redid the rings, re-honed the cylinders, cleaned the valves, and brought them up to standard clearances. I am hoping she will start up in a couple of weeks.

 

Regards,

Bob

  • Excellent 1

Share this post


Link to post
Share on other sites
 

Create an account or sign in to comment

You need to be a member in order to leave a comment

Create an account

Sign up for a new account in our community. It's easy!

Register a new account

Sign in

Already have an account? Sign in here.

Sign In Now

×
×
  • Create New...