ri702bill 11,573 #1 Posted 8 hours ago (edited) Work continues on the C81 I picked up last July. Three of the four shaker plate isolation mounts were bad - one far worse than the rest - the steel center sleeve was completely broken out of the rubber. All 4 were questionable on the parts donor too. The fix I decided on was to reuse the eight steel flange shells and discard the rubber & sleeves. I made up four make & four female aluminum inserts - they pilot into each other when assembled. An 8 inch length of 1-1/2 diameter aluminum set me back about 14 bucks. Additional centering rings were made to pilot into the steel plate. Not having CNC capability on my lathe, it was fairly labor intensive to turn up the aluminum parts, but the result almost looks like the originals when I did the powder coating... Edited 7 hours ago by ri702bill 3 7 Share this post Link to post Share on other sites